Multi-Fuel Cogen Plant

Working closely with various clients, Wave’s responsibilities were to deliver...

Sample Stations Upgrade

Wave was commissioned to perform the Identification Phase Study and...

Diesel Tank Floor Replacement

Wave worked on behalf of the client to provide engineering services for...

Planner Training Development

Wave International was engaged by FMG to review and develop... 

Process Development

Wave was engaged to assist in developing Asset Management Processes...

Curragh Shut Down

Wave International was appointed by the client to be the management team...

Chain Scraper Reclaim Feeder

Wave was approached by the client to assist with the design of...

Critical Plant Inspections

One of our major clients required inspections to critical fixed and mobile plant...

Rail FBW Facility

Wave's Asset Management department was engaged to peform Maintenance...

Maintenance Readiness

Wave was engaged to perform the Maintenance Readiness Project for...

Fine Coal Centrifuge

Wave was engaged to provide mechanical, structural, piping and electrical...

Motor Control Centre Upgrade

Wave undertook all the electrical engineering and drafting of five motor...

Substation Design & Construct

This project involved the design, supply, delivery, construction and...

11kV Power Factor Correction

The project involved the design and procurement of an 11kV capacitor bank... 

SharePoint Solution

Wave International was required to establish a SharePoint based...

Truck Dump and Screening Plant

Wave was commissioned to deliver the design and construction management...

Truck Body Stand

The project was to produce a stand that enabled the Maintenance Department...

Curragh Mine North - Haul Road

Wave International was appointed as the engineers for the design and...

CPP Belt Filter Upgrade

BMA identified that by installing an additional belt filter into its wash plant...

Metallic Flotation/ Leach facility

Wave International undertook detailed design of the Antimony / Gold Hillgrove...

Kwale Mineral Sands Project: Haul Road

Wave International was appointed as the clients engineer to oversee...

Kwale Mineral Sands Project: Dam & TSF

Wave International was appointed by the client to be part of the integrated...

Lithium Processing Plant

Structural design, modelling and drafting of the lithium upgrade processing plant...

Marine Structures Asset Management

Structural integrity inspections and preparation of remedial scope of works for...

Mt Gibson Plant Upgrade

Detailed design of modifications to crushing station to incorporate new...

Oversized Protection Screen

SWC Mine approached Wave International to Engineer and Design a protection...

Premier Coal Water Treatment Plant

Wave International undertook the EPCM delivery of the Water Treatment Plant...

Process Plant Upgrade Study

The process plant upgrade project involved a throughput study of an existing...

FRCP Equipment Guarding

As part of BMA’s FRCP (Fatal Risk Control Protocols), a machinery guarding...

Rio Tinto Paraburdoo CV4 & CV5

Detailed design of upgraded plant conveyors to allow additional...

Salt Conveyor Upgrade

Detailed engineering design for new conveyors, upgraded equipment and...

Tritton Plant Upgrade

Design and shop detailing for upgrade of copper concentrator at...

Shovel Motivator

BMA required a mobile power supply unit to power the movement of electric...